Project Limits: Approximately 1-mile stretch of Smith Road between Merriman Road to Middlebelt Road.
Project Description: Up-sizing the water main from 8-inch to 12-inch.
Traffic Impact/Detour: Traffic will be maintained throughout the project with closures at both Merriman and Middlebelt roads during the connections of the new main to the existing mains. Traffic will be maintained along Smith utilizing flaggers.
Schedule: This project will begin in September 2024 and continue to November 2024.
PROJECT UPDATE:
Additional notifications will be provided to those within the project limits throughout the construction process as necessary.